PDC was selected by the North County Transit District (NCTD) to prepare and process construction permits for the Sorrento Valley Platform Extension project.

 

Included in the project are a grading and drainage plan, a topographic map, landscape development plan, and a site plan. The site plan includes a vicinity map, rail road right-of-way, easements, bus stops, street improvements, off-street parking, site section lines, and both proposed and existing utilities.

 

SERVICES:

 

• Engineering

• Survey

 

 

 

 

 

Sorrento Valley Transit/Extension/Sorrento Valley Double Track

San Diego, CA

Phone Site

Copyright Project Design Consultants © 2017